SERVING THE COMMUNITY

With an investment of $3.4 million, this modern construction not only meets governmental standards but is also designed to serve the community.

Our team managed the design, preparation for production, manufacturing, machining, and installation of the glued-laminated timber structure.

The structure of the barracks was built using glued-laminated timber supplied by Art Massif. The main beam weighs 3,530 kg (7,785 lb) and measures 365 mm in width x 1,250 mm in height x 15.5 m in length (14 3/8″ x 49 3/16″ x 51 ft), the largest beam section in our history.

Crédit Photo : Atelier Guy architectes et Art Massif